Employees are reminded to speak to their Supervisor first about a health and
safety concern. If corrective action is not taken, then the employee is to
report the matter to their health and safety representative.
1. ADOPTION OF
PREVIOUS MINUTES
The minutes from the Health & Safety Meeting of August 16th were
approved as printed/circulated with the exception noted, that the Supervisor
of Training is responsible for coordinating the 2 day First Aid/CPR course
not the Manager of Service Delivery.
2.
RECOMMENDATIONS
No recommendations submitted at previous meeting.
3.
WHMIS UPDATE
Ten new employees will receive WHMIS training next week.
4.
TRAINING
Presently
ten new operators are going throw the training program. The management
co-chair is to arrange with the Supervisor of Training a two day First Aid &
CPR course for committee members requiring recertification.
5. MSDS REVIEW
No items or products were brought forward. It was noted that it is the
responsibility of the Stockroom to provide MSDS sheets when products come
in. The Quality Process Officer will be writing a SPI regarding this.
6.
ITEMS CARRIED FORWARD (See Outstanding Items List)
7.
AGENDA
ITEMS
No items
reported.
8. WORKPLACE
INSPECTIONS
Items to be
addressed:
Location Hazards Observed
Action
Sandblaster, Bay 1 Left glove, rubber is
ripped Replace
Door 6
& 7 Bird feces on shop
floor Housekeeping
First
Aid Room Missing finger bandages & gloves
Replenish
Sign
Up Room Carpet extremely
filthy Steam Clean
9. VEHICLE
ACCIDENT SUMMARY – AUGUST 2005
Management
co-chair stated that adjudication for August is still to be completed.
|
Accidents |
On-Board Accidents |
Incidents |
Internals |
Shelters |
Total
Accidents |
Non-Preventable Accidents |
Preventable Accidents |
|
27 |
12 |
50 |
1 |
2 |
92 |
21 |
1 |
10. WSIB
(Workplace Safety Insurance Board) SUMMARY
Four
WSIB reports
were filed in August for Malton Satellite which resulted in no lost time
claim.
11. HAZARD
INFORMATION REPORTS
No written
reports received in August.
12. NEW
BUSINESS
Storage Area
–
Worker rep stated that the build up of engine oil in the bus bay storage
area needs to be addressed as it has become a safety hazard. Management
co-chair to contact Building Mtnce Coordinator as the pavement surface in
Malton is asphalt rather than cement which cannot be scraped as done in the
Central garage.
13. ADJOURNMENT
Meeting
adjourned at 1:30 p.m.
Next
Terminal Inspection: October 3rd
(MA rep)
Next
Plant Inspection: TBA
Next
Health & Safety Committee Meeting: Tuesday, October 18,
2005
---------------------------------------------------------
------------------------------------------------
Local1572 Signature
Date
---------------------------------------------------------
------------------------------------------------
Transit Department Signature
Date
Malton Satellite Health & Safety Committee
Minutes
September 20, 2005
Page 3
|
|
Outstanding Items List |
|
|
Item |
|
Approximate
Completion Date |
|
Outside
Storage Shelter
April/05 |
Worker
rep stated that the shelter has been moved however area is still to
be leveled. Bldg. Mtnce Coordinator stated that once manpower is
available, work will be completed. |
Ongoing |
|
Wash Bay
March/05 |
CFM has
been contacted and will be checking the air flows. Management
co-chair to follow up with Bldg. Mtnce. Coordinator. |
Ongoing |
|
Dust
Recovery System
May/05 |
Management co-chair stated that testing is being done at CP on a
brake cleaning dust recovery system to reduce dust created. Once a
decision has been made the recovery pan will be sent to Malton. |
Ongoing |
|
9700
Units
August/05 |
Harper
Diesel currently on site modifying the governor on all units to 100
kilometers/hour. |
Item
dropped |
|
Outside
Line Markings
August/05 |
Bldg.
Mtnce Coordinator to arrange the painting of all outside line
markings around the facility including walkways & picnics areas. |
Ongoing |
|
Westwood
Mall
August/05 |
Bldg.
Mtnce Coordinator to arrange removal of the “no exit” sign and
installation of a “right turn only” sign. |