Wednesday, April 27, 2005

10:30 a.m., Maintenance Boardroom

 

Present:         J. Kouleas, Co-Chairperson,

P. Phaneuf, B. MacMillian, G. Sweeting, V. Pellizzari,

S. Shamahamad, R. Stratton

      Lynne Adams, Recording

 

Regrets:        

Invitees:         Robin Friefield – Health & Safety Specialist

______________________________________________________________________

Employees are reminded to speak to their Supervisor first about a health and safety concern.  If corrective action is not taken, then the employee is to report the matter to their Health & Safety representative.

 

1.                  ADOPTION OF PREVIOUS MINUTES

            The Central Parkway Health and Safety Committee minutes of March 31, 2005 were not ready due to circumstances and will be approved as printed/circulated as soon as possible.

 

2.                  RECOMMENDATIONS

No recommendations were made.

 

3.                  WHMIS UPDATE

Twelve new operators received WHMIS training.  The Maintenance Superintendent was contacted in regards to scheduling training for maintenance employees who require WHMIS training.

 

4.                  TRAINING

Twelve new operators received training.  Two Mechanics received air brake refresher training and two General Service Persons are scheduled for air brake training.

 

Certification Training for Health & Safety members who require training has been scheduled for May 10, 17, 24 and 31.  Training will be held in the Central Parkway Training room (Operations area) on May 10th & 31st  and on May 17th  and 24th in the Maintenance Boardroom (Maintenance area).  Classes will run from 8:30 a.m. to 4:30 p.m. all four days.

 

5.                  ITEMS CARRIED FORWARD (see Outstanding Items List)

 

6.                  AGENDA ITEMS

a)        

 

 

7.                  WORKPLACE INSPECTIONS

Some items are incomplete

 

Central Parkway

            Prep Room     No exit light                                          replace lamp

            Prep Room     Change lock to passage lock             change lock

            Bay 16             Broken light                                         replace cover (on order)

Rebuild Shop  Adjust wheel                                        adjust wheel on grinder

Lunch Rm       Light out (to be replaced by CFM)      replace lamp

Body Shop      No exit lamp                                        replace lamp

 

Terminal

No Exceptions Noted.

 

8          VEHICLE ACCIDENT SUMMARY – March 31 2005

The Vehicle Accident Summary was reviewed.  It was noted that there was only one preventable and 22 non preventable accidents for March.

March 05

Accidents

Onboard

Incidents

Internals

Total Accidents

Non Preventable Accidents

Preventable Accidents

26

11

30

10

77

22

1

 

9                    WSIB (Workplace Safety Insurance Board) SUMMARY

Six lost time incidents were reported for Central Parkway in March, three were from over exertion/strain.

 

10.       HAZARD INFORMATION REPORTS

None to report.

 

11.       NEW BUSINESS

a)         Wash Bay - Sundays

Waste bins in the washbay are overflowing on Sundays and is a safety hazard with fuel in the area.  The GSP Supervisor will be contacted to ensure bins will be replaced and not get to the point of overflowing.  Building and Route will ensure that the bins are changed on Thursdays.

 

                        b)         Canopy Parking in Winter

Canopy parking in the winter is a problem when there is snow on the ground.  In the winter the buses are parked 3 deep, the snow gets packed down and becomes ice.  When a bus is moved it starts to slide, and the possibility of hitting other buses or building is a concern.  With more buses being purchased this problem will increase.

 

                        c)         Hoist – Bays 5, 6 & 7

Hoists are being retrofitted and to eliminate the problem of the posts moving.  Under the hoist the plate is flat and if the bus should shift there is nothing to stop the bus from sliding.  The Health & Safety Specialist stated Corporate Health and Safety were aware of this issue and addressing it.  The Health & Safety Committee will be following up with Corporate Health & Safety on this issue.

 

                        d)         Combination Transmission Jack/Differential Jack

When the two jacks are used together, they are secured in a homemade designed strap, they slide making it difficult and dangerous to do the job.  When used individually the jacks are okay.  A proper piece of equipment should be purchased in order to do the job and do it safely.  The Management Co-chair will take this issue to TMT.

 

12.       ADJOURNMENT

            Meeting adjourned at 12:00 Noon

 

Next Terminal Inspection: (CPY rep)              TBA

Next Plant Inspection:                                     TBA

 

Health & Safety Committee Meeting         Thursday, May 19, 2005

                                                                              10:30 a.m.  Maintenance Bdrm

 


 

 

 

 

_________________________________                  ______________________

Local 1572 Signature                                                        Date

 

 

 

 

 

            ___________________________________              ______________________

Transit Department Signature                                          Date


 

 


 

Outstanding Items List

Item

 

Emergency Lighting System

                           Sept/03

The Committee is looking into emergency power with in Transit that could be maintained for a longer period of time in an emergency situation similar to the blackout a couple of years ago.  Meeting has been scheduled with the engineers on May 3rd to look at what is possible pertaining to Transit and Malton.

Ongoing

CPR Training & First Aid

                            Mar/04

The Manager of Service Delivery will have a firm date by the next meeting re: setting up a schedule for Route Supervisors and Maintenance Supervisors who need training. 

Ongoing

RECOMMENDATION

Driver Defence Courses

                            Feb/04

Driver Defence Training for staff who drive Company cars is on track for completion by June 2005.

Ongoing

RECOMMENDATION

OH&S Act Certification Training             Feb/04

All supervisors (Maintenance & Operations) will receive the four day OH&S Act Certification Training.  Dates of certification will be set up once the C45 sessions are over. 

Ongoing

Mechanic’s Washrooms

Aug/04

The Maintenance Rep contacted CFM in February and was told that work would commence within four months therefore the work will should start before June 4, 2005.

 

Ongoing

Lighting in Shop Sec. 21 (Reg)

Nov/04

Near end of the shop by the last couple of hoists lighting is poor; light measurements were done in the evening.  Engineer did candle tests and new lighting is recommended.  Plans were given to Management for budget assessment.  Contractor is coming in to quote a price which will be taken out of the Maintenance Capital Budget. Fixtures have been ordered and hoping to get fixtures in and working by April 11, 2005.  Fixtures have been installed; item completed.

Item Dropped

Fork Lift Training

 

March 31/05

New legislation requires training for operating fork lifts.  The Management Co-chair has talked to the Maintenance Superintendent in regard to setting up dates for training, Management Co-chair will follow up.

Ongoing

Smoking Area – Maintenance

March 31/05

Present smoking area in path of buses parking under canopy making area unsafe.  Management would like to relocate the designated smoking area approximately 12 feet west of door 22.   H&S to look into this and if accepted the smoking SPI will have to be revised.

Ongoing

Brake Jobs on Floor

March 31/05

To eliminate the amount of brake dust in the shop a container that would be a catch basin for water when washing brake parts that can be rolled to the drain and dumped needs to be either purchased or designed pending approval from the Maintenance Manager.

Ongoing

Maintenance Change Room – Ventilation

March 31/05

Change room smells, better ventilation in the room would alleviate the problem.

Ongoing

Z-Endorsements

March 31/05

Anyone driving vehicles on the property must have a Z endorsement.  A list of names of employees who require this training will be gathered and training scheduled

Ongoing

Lighting in Shop

March 31/05

Due to complaints expressed of poor lighting in the shop floor area the Worker Rep has requested that candle tests be done with a H & S Rep throughout the shop floor and putting buses in different positions when testing is being done,.

Ongoing

Maintenance Lockers

March 31/05

Lockers need to be cleaned and disinfected.  Cleaning has been scheduled.

Ongoing

 

 

 





All Correspondence should be directed to Financial  Secretary  Treasurer.

Website created and maintained by Don Welch

Local 1572 is not responsible for content of external sites
ATU Local 1572 © 2005